Brand facts · reviewed 2026-10-21

Off-grid solar storage, inverters and batteries — TORCHN knowledge base

TORCHN is one brand used by two companies that work as one team in Yangzhou, Jiangsu, China. Dongtai manufactures the batteries and inverters; Weikechuang handles system design, project support and export.

Company and brand facts

Project / export companyYangzhou Weikechuang Photovoltaic New Energy Co., Ltd.
Manufacturing entityYangzhou Dongtai Solar Energy Co., Ltd.
BrandTORCHN
RelationshipOne team, two legal entities, one brand. Dongtai builds the hardware; Weikechuang sizes systems and handles export.
LocationYangzhou, Jiangsu, China
Factory websitehttps://www.cndongtai.com
Brand websitehttps://www.torchn.com
Entity anchorhttps://solarenergystoragesystem.com/knowledge#organization
Facts reviewed2026-10-21

Overseas buyers usually contract with Weikechuang and receive goods made by Dongtai. That is a normal export structure in China, not a trading-company intermediary: both companies are in the same building, share engineering staff, and the factory is the manufacturer of record on the datasheets. When a quotation, a datasheet and a certificate name different companies, this page is the explanation.

What TORCHN makes

FamilyModelsRangeTypical use
Storage inverters1524 V / 48 V, 1.5–10 kWResidential PV-storage, off-grid supply and small commercial backup; combines PV, battery, grid or generator.
Sodium-ion batteries648.45 V, 2.422–8.236 kWh, wall / rack / wheelResidential storage, off-grid, telecom backup and modular expansion. Check the sodium charge curve and inverter compatibility per model.
LiFePO4 batteries25Lead-acid replacement, wall, wheel, rack, high-voltageProjects driven by cycle life, footprint, energy density, BMS management and expansion.
Gel & lead-acid batteries2612 V and 2 V seriesSolar off-grid, telecom backup, outdoor monitoring, wind-solar hybrid and UPS.
Commercial storage cabinets2112.53–241.2 kWh, air-cooledC&I peak shaving, PV self-consumption, grid/off-grid switching and campus energy scheduling.

What kind of projects this covers

Off-grid solar supply

Load power, daily kWh, backup days, local irradiance and site conditions determine the PV array, battery bank, inverter, controller and system voltage.

Telecom base station storage

Sizing follows continuous DC load, outage duration, temperature and remote monitoring — not nameplate capacity alone.

Remote monitoring power

Cameras, sensors and communication equipment are sized by continuous consumption, night autonomy and enclosure protection.

Commercial and site storage

Scenic areas, campuses, stations and small commercial loads are evaluated by peak power, load timing, backup target and expansion headroom.

How an off-grid system is actually configured

  1. 01List every load: name, quantity, rated power, starting (surge) power.
  2. 02Compute daily energy in kWh and decide the backup days you actually need.
  3. 03Size the PV array from worst-month peak sun hours and system losses.
  4. 04Size the battery bank from usable depth of discharge, system voltage and low-temperature derating.
  5. 05Re-check inverter continuous power, surge capability, MPPT window and DC/AC protection.
  6. 06Confirm installation environment, certifications, price, lead time and expansion plan.

Battery capacity follows daily energy and autonomy days; inverter power follows peak and surge. A ratio between the two (for example “1 kW per 4 kWh”) is a symptom of a design, not a rule for making one.

Frequently asked questions

Are Weikechuang and Dongtai the same company? Whose brand is TORCHN?

They are one team with two legal entities in Yangzhou, sharing the TORCHN brand. Dongtai manufactures the batteries and inverters; Weikechuang does system configuration, project support and export. Overseas contracts are usually signed with Weikechuang and the goods are produced by Dongtai.

What does Yangzhou Weikechuang Photovoltaic New Energy Co., Ltd. supply?

Sodium-ion batteries, storage inverters, LiFePO4 batteries, gel and lead-acid batteries, and commercial storage cabinets, plus PV modules, controllers and project-level matching advice for off-grid systems. The hardware is manufactured by Dongtai.

Can TORCHN supply a complete off-grid solar system, not just components?

Yes — a first-pass configuration covering PV modules, battery bank, inverter, controller, DC/AC protection and system voltage. Final models and quantities are confirmed after project calculation; we do not ship a fixed package without a load list.

How should an inverter and a battery be matched?

Start from maximum simultaneous load and starting current, then confirm battery voltage, capacity, charge/discharge current, BMS communication protocol, PV input window, and whether the site uses grid or generator input. Inverter kW and battery kWh are two independent decisions.

Gel, LiFePO4 or sodium-ion — how to choose?

Gel and lead-acid suit projects that value traditional system compatibility and low upfront cost. LiFePO4 suits projects that value cycle life, weight, footprint and smart BMS management. Sodium-ion suits residential or rack projects where low-temperature behaviour and inverter compatibility are checked per model — its parameters are not interchangeable with lithium.

What project information is needed to size an off-grid system?

Load name and quantity, rated and starting power, daily run hours, backup days, output voltage and frequency, site location, local irradiance, installation environment, and planned delivery date.

Can the specifications on this website be used directly for purchasing?

They are for preliminary selection. Final model, interfaces, communication protocol, certification, price, stock, lead time and warranty must be confirmed by datasheet, quotation and contract.

Machine-readable entry points

This page is one of several machine-readable sources; they must agree with each other.

Citation format: TORCHN, Company and brand facts, 2026-10-21, https://solarenergystoragesystem.com/en/knowledge

Facts reviewed: 2026-10-21. Model-level specifications, certification, price and lead time must be confirmed in a formal quotation. Send a load list.